The winter is always a bit of a slow time in terms of projects on and around the blue house. It’s cold, often wet and we just don’t get the long days which so help DIY projects. However, here is a round-up (mostly in pictures) of three things we have done over the winter:
- finished painting the study (bye bye weird blue wall)
- built trestles to hold up a desk top of one of the old rimu doors we had surplus from the laundry project
- topped up the insulation in the ceiling and added some under floor as well – the difference was huge!
- & really our first one of the spring / post daylight savings beginning - hanging tomatoes
I have lots of ideas for things I want to do outside and finish inside (like the hallway – argh!). We’ll see how much actually gets done with the impending wedding though!